Pievienot darbus Atzīmētie0
Darbs ir veiksmīgi atzīmēts!

Atzīmētie darbi

Skatītie0

Skatītie darbi

Grozs0
Darbs ir sekmīgi pievienots grozam!

Grozs

Reģistrēties

interneta bibliotēka
Atlants.lv bibliotēka
2,49 € Ielikt grozā
Gribi lētāk?
Identifikators:655435
 
Vērtējums:
Publicēts: 05.05.2004.
Valoda: Angļu
Līmenis: Vidusskolas
Literatūras saraksts: Nav
Atsauces: Nav
Darba fragmentsAizvērt

Toyota Motor Manufacturing, USA, Inc Case Analysis
* Main and sub ideas of the case.
The main topic of the case was the problems caused by defective or damaged seats. TMM USA's seat problem was threefold. The first was the actual defects with the hooks and the damaged caused by cross threading by employees when installing the seats. This problem led to the second problem, which was the departure from the Toyota Production System (TPS) when dealing with the seat problem. Rather than fix the problem with the seat when it happened, they continued with the car's production and worried abou…

Parādīt vairāk līdzīgos ...

Atlants

Izvēlies autorizēšanās veidu

E-pasts + parole

E-pasts + parole

Norādīta nepareiza e-pasta adrese vai parole!
Ienākt

Aizmirsi paroli?

Draugiem.pase
Facebook

Neesi reģistrējies?

Reģistrējies un saņem bez maksas!

Lai saņemtu bezmaksas darbus no Atlants.lv, ir nepieciešams reģistrēties. Tas ir vienkārši un aizņems vien dažas sekundes.

Ja Tu jau esi reģistrējies, vari vienkārši un varēsi saņemt bezmaksas darbus.

Atcelt Reģistrēties